- Per project
- Not stated
- To apply
- 1 step to apply
Not open to projects in
It takes projects in Oregon: United States.
The money
- Per project
Not found on the pages we read
- Co-funding required
Yes
At least 25% of the project, in-kind accepted (projects not initiated by DSL).
A 25% funding match is required for all projects not initiated by DSL (in-kind or cash). Source: oregon.gov · SLEFChecked November 20, 2026.
A 25% funding match is required for all projects not initiated by DSL (in-kind or cash). Source: oregon.gov · SLEFChecked November 20, 2026.
Who can apply
- Where
Oregon:
United States
✓ Includes
◐ Only part of : Oregon
✕ Doesn’t include
More grants in United States and North America.
Projects that enhance the beds and banks of Oregon-owned waterways often benefit water quality, surrounding wildlife, and waterway users. Source: oregon.gov · SLEFChecked November 20, 2026.
- Organisations
NGOs, Government bodies and Indigenous organisations
State agencies, city or county governments, federally recognized Tribes, water improvement districts, watershed councils, park and recreation districts, ports, and non-profit organizations. Source: oregon.gov · SLEFChecked November 20, 2026.
Applying
- How to apply
Apply directly
When a call is open, eligible applicants apply to the funder or the organisation running the call.
Subscribe to our "Waterways and Wetlands" list to be notified when applications open for 2027-29! Source: oregon.gov · SLEFChecked November 20, 2026.
- Work to apply
Heavy: 1 step, 8 documents
Before you apply: the rules, the documents and the steps, in the funder’s words.
Chance of funding: not published · Is it worth your time?
Before you apply
Heavy: 1 step, 8 documentsOur label, from the steps and documents the funder lists.
Can your organisation apply?
These rules rule you out. Answer each one; tap a rule for the funder’s words.
Answer all 2 to see if you can apply.
Documents to have ready
- Street or highway location map with road directions
- Assessor map containing the riparian uplands
- Scaled drawing of existing and proposed structures and activity
- Legal description and delineation of the work area
- Project schedule
- Itemized project budget
- Work Plan or Operation & Maintenance Plans, if prepared
- Confirmation of contributing match
A street or highway location map with road directions to the site from the nearest main highway or road. Assessor map that contains the riparian uplands. Do not mark on this map. A separate drawing to a scale of 1 inch = 100 feet of all existing and proposed structures and activity. Source: oregon.gov · SLEF Grant Application (PDF)Checked November 20, 2026.
A legal description of the work area with an accurate delineation of the area relative to the tax lot boundaries of the upland parcel. (The Department may require a survey for this purpose). e) Project schedule including beginning and completion. f) Itemized Project Budget, including use of requested funds and contributing match funds. Source: oregon.gov · SLEF Grant Application (PDF)Checked November 20, 2026.
All Work Plan or Operation & Maintenance Plans that have been prepared for the proposed activities. h) Confirmation of contributing match. Source: oregon.gov · SLEF Grant Application (PDF)Checked November 20, 2026.
Is it worth your time?
How to read itThe call
Closed2025-27 grant cycle
Call page- Status
Closed
Applications for the 2025-27 grant cycle closed on April 30, 2026. Source: oregon.gov · SLEFChecked November 20, 2026.
- Deadline
Not found on the call page
The funder says applications for 2027-29 will be announced later; no date is stated.
Calls for other countries
What the funder asks grantees to report
- Reporting
Not found on the pages we read
Something wrong?
Every fact above links to the page we read it from. If a deadline, amount or rule has changed, report a problem and we will check it against the funder’s page. Are you this funder? Correct this listing.
Both open an email to contact@naturefunding.org with this listing filled in. Listings can’t be bought.